31.8 C
Manila
Lunes, Abril 28, 2025

Update ng DoTr sa 147-km North-South Commuter Railway (NSCR) Project

- Advertisement -
- Advertisement -
NARITO ang update sa 147-km North-South Commuter Railway (NSCR) Project (Malolos – Tutuban) ng Department of Transportation (DOTr) at Philippine National Railways (PNR).
Mayroong tatlong bahagi ang NSCR: ang Malolos–Clark Segment, Tutuban–Malolos Segment, at Solis–Calamba Segment.
Oras na matapos ang NSCR project, kaya nitong magsakay ng aabot sa 800,000 na pasahero kada araw, mula sa Clark, Pampanga hanggang sa Calamba, Laguna.
(Video: Sumitomo Mitsui Construction Co., LTD.)
- Advertisement -

- Advertisement -
- Advertisement -